NUCO Oil Pit removal
CSS supported EPA as the field team leader on a removal assessment at an abandoned oil pit site in Oklahoma.

Supporting Assessment and Remediation Activities at Contaminated Sites
On-Site Technical Services at an Abandoned Waste Oil Pit
CSS supported EPA as the field team leader on a removal assessment at an abandoned oil pit site in Oklahoma. We developed the Quality Assurance Sampling Plan and site-specific Health and Safety plan for conducting waste sampling from inside a waste oil pit. Our staff used an aerial manlift to oversee the collection of twelve waste samples from four separate locations within the pit. We returned to the site to serve as the field team leader during the removal of the contaminated sludge. In this role we:
- supervised the EPA removal contractor;
- prepared written and photographic documentation of removal activities;
- conducted air monitoring during the pumping/excavation and loading of oil pit contents into disposal trucks for off-site disposal;
- maintained copies of the non-hazardous waste manifests; and
- prepared the final Oil Pollution Act Removal Report.
Additional Projects
Network Engineering Design and Support
CSS engineers and deploys large-scale networks to support multi-campus and multi-facility environments.
Regulatory Documentation Development
CSS develops documents to meet the requirements of environmental regulations.

Maintenance and Repair of Shuttle Landing Facility (SLF), Space Florida
CSS served as the prime contractor performing comprehensive facilities management for the Shuttle Landing Facility (SLF) and accompanying facilities. Now called the Launch and Landing Facility (LLF), it is one of the longest runways in the world at 15,000 feet, serving NASA and private aviation and commercial science companies. CSS assisted Space Florida in transitioning…

Get in touch
Contact us to learn more about our projects, capabilities, solutions, and service offerings.