Plant Water Management in Microgravity
CSS was selected by NASA through its REMIS contract to serve as payload developer, performing mission integration and operations to advance the fundamental research to a higher Technology Readiness Level.
The Plant Water Management (PWM) project demonstrates the concepts of adequate hydration and aeration to a plant’s root zone in a microgravity environment to sustain plant life from germination through harvest. PWM capitalizes on physics and geometry that is functional in both a normal and microgravity environment to deliver water and nutrients.
CSS was selected by NASA through its REMIS contract to serve as payload developer, performing mission integration and operations to advance the fundamental research to a higher TRL (Technology Readiness Level). CSS supported the PWM principle investigator in developing the science and engineering requirements that served as the blueprint for developing the 3,4,5 and 6 series of hardware delivered to the International Space Station (ISS) for demonstration.
Additional Projects
Network Engineering Design and Support
CSS engineers and deploys large-scale networks to support multi-campus and multi-facility environments.
Predictive Modeling/Spatial Planning, NY Bight
CSS designed and implemented this integrated data acquisition, data management, and statistical predictive modeling to select optimal wind farm locations while minimally impacting seabirds.
Superfund Program Removal Action Support
CSS’ On-Site Analytical Support Accelerates Site Cleanup and Restoration.
Get in touch
Contact us to learn more about our projects, capabilities, solutions, and service offerings.